Otuabagi Project Stage 3

The following pictures represent the excavation and installation of the protection gabion and reno mattresses filled with stones.

Interglobal Engineer With Nddc Official

Interglobal Engineer Taking Measurements

Interglobal Engineer, The Nddc Officials & Skilled Labourers

Hardcore Delivered To Site

Excavation of the Foundation to the Actual Depth

Laying Of Gabion Mattress And Filter Fabric

Filling of Gabion Mattresses with Stones

Laying And Filling Of Gabion & Reno Mattress Ongoing

Laid And Filled Reno Mattresses

 Laid And Filled Gabion And Reno Mattresses

Installation Of Filter Fabric To Protect Toe

Installation Of The  Reno Mattress At The Toe

Laying And Filling Of Reno Mattresses

Laid And Filled Reno Mattresses And Gabion Walls

Laid And Filled Reno Mattresses

Laying And Filling Of Gabion Along The River Shore

Final Level Of The Reclamed Area

Final Protected Wall Along The Shore

×